Skip to content
Construction crane above a concrete frame

02

Drawn here. Built here.

The people who signed the drawing set are still on the call when the slab is cast. That is the whole argument for keeping design and build under one roof.

Contracting

Our own site teams building what our studio drew.

  • One contract across design and build
  • Weekly site notes and photographs
  • MEP coordinated before finishes land
  • Written snag closure before keys

Contracting is not a handover to a third party with a different interpretation of the drawing. Our supervisors run civil, MEP and finish against the approved set, with weekly progress you can actually track.

Snagging is written, not verbal. Warranties and as-built drawings leave with the keys - and we stay reachable after the last invoice.

Programme

What you leave with

  1. 01

    Programme and cost

    A dated programme and a running cost position, updated as the site moves.

  2. 02

    Civil and structure

    Foundations, frame and envelope executed to the structural and architectural set.

  3. 03

    MEP coordination

    Electrical, plumbing and HVAC laid out against the furniture and finish plans.

  4. 04

    Finish and handover

    Fit-out, snag list closed in writing, and a documented handover package.

Site pace - the drawing set becoming a building.

Selected frames

Atmosphere from the practice

Construction crane above a concrete frame
Construction crane above a concrete frame
Architect reviewing drawings on a building site
Architect reviewing drawings on a building site
Workers installing structural steel
Workers installing structural steel
Finished interior shortly after site handover
Finished interior shortly after site handover

Ready to talk through a brief?

Share the site and what you want from contracting. We come back within two working days with next steps.